✨ New Arrivals Just Dropped!Explore
Product image 1
HomeStore

Lighthouse #2 Wood Project Plan(F)

Lighthouse #2 Wood Project Plan(F)

This easy-to-make project was modeled after an actual lighthouse. Easily made from our full size pattern. (60" tall)

More Info

Description:
Lighthouse with nautical stripes

Dimensions:
59" tall, Base is 11" x 11"

Wood:
1/2", 3/4" and 1-1/2" thick #2 (or better) pine
Requires: One 1X10 x 12' long Pine board
One 1X12 x 8' long Pine board
One 2X12 x 10-3/4" (cuts Base)

Saw:
Table Saw and Scroll Saw

NOTES:
This is a non-working (Lighting!) Lighthouse

Winfield Parts:
Eyescrews - One package 5/16" I.D. (#EYE3)
Brass Rail Kit - One (#BRKIT2)
Finial - One 2-1/4" tall wood (#FIN1)
Wood Glue - (#GLUE)

Paints:White primer (#PRIMQT) for a base coat and the following suggested colors of acrylic paint or exterior semi-gloss enamel:

2083 Fire Red
2505 White
2506 Black

Sealer: High-grade, non-yellowing, semi-gloss UV protected project sealer for outdoor protection (#POLYQT).

$3.31

Original: $9.45

-65%
Lighthouse #2 Wood Project Plan(F)

$9.45

$3.31

Product Information

Shipping & Returns

Description

This easy-to-make project was modeled after an actual lighthouse. Easily made from our full size pattern. (60" tall)

More Info

Description:
Lighthouse with nautical stripes

Dimensions:
59" tall, Base is 11" x 11"

Wood:
1/2", 3/4" and 1-1/2" thick #2 (or better) pine
Requires: One 1X10 x 12' long Pine board
One 1X12 x 8' long Pine board
One 2X12 x 10-3/4" (cuts Base)

Saw:
Table Saw and Scroll Saw

NOTES:
This is a non-working (Lighting!) Lighthouse

Winfield Parts:
Eyescrews - One package 5/16" I.D. (#EYE3)
Brass Rail Kit - One (#BRKIT2)
Finial - One 2-1/4" tall wood (#FIN1)
Wood Glue - (#GLUE)

Paints:White primer (#PRIMQT) for a base coat and the following suggested colors of acrylic paint or exterior semi-gloss enamel:

2083 Fire Red
2505 White
2506 Black

Sealer: High-grade, non-yellowing, semi-gloss UV protected project sealer for outdoor protection (#POLYQT).

Lighthouse #2 Wood Project Plan(F) | The Winfield Collection